McDonalds

30 July 2016 / By admin
/ GROUNDWORKS AND CONSTRUCTION RE-FIT

Date: July 2016
Duration: 6 Weeks
Value: Circa £150k

SinCera were engaged by Key Property Solutions (KPS) to carry out major groundworks (side by side Drive-Thru renovation) to the external perimeter of the site, as well as the complete construction of a new external storage area and internal fit out works (tiling and general civil works).

In the early phases of the project the scope was changed considerably and SinCera aided the main contractor in resourcing and working to a new program, ensuring the project was handed over on time and to the clients satisfaction.

Below are a list of the works which were implemented on this particular project.

GROUNDWORKS

– Double Drive-Thru Conversion
– Paving
– Drainage
– Resurfacing (Tarmac)

CONSTRUCTION

– New Build External Storage
– Structural Openings
– BWIC

FIT-OUT

– Tiling
– Joinery