David Lloyd Clubs, Leeds, Spa Refurbishment

SinCera were engaged by Key Property Solutions (KPS), as part of a rolling program of refurbishment works, to complete the necessary groundworks for a new internal Spa Pool, c/w Sauna’s and Steam Rooms at David Lloyd in Leeds. SinCera also completed the full package of tiling and finishing works associated with the new Spa area.

DAVID LLOYDS, LEEDS
CONSTRUCTION / EXCAVATION / FIT-OUT

Client: KPS
Date: July 2015
Duration: 12 Weeks
Value: Circa £100k

Working internally with limited access and environmental considerations (fumes / ventilation) SinCera had to employ the use of Brok electric plant and track barrows to excavate for the drainage and internal Spa pool. Over 150t of material was removed from the site in only 3 Days using a 1t excavator and 3 x 250kg track barrows, a fantastic achievement.

SinCera also carried out various other works to the complex which consisted of tiling to a high standard and very complex groundworks to install an internal and external spar area. The team managed to work in a live environment, behind hoardings Sincera managed not only to complete on target date and keep a clean and tidy work area for David Lloyd members to carry on with their usual daily activities.

Below are a list of the works which were delivered on this particular project:

  • Demolition

  • Excavation (internal)

  • Drainage

  • Tiling

  • Concrete slabs

  • Blockwork

  • Partition walls

  • Floor and wall chasing

  • Structural openings

  • Joinery

  • Groundworks

Share this project.

Previous
Previous

NEXT, Teeside Retail Park

Next
Next

Royal Mail Entrance & Lobby, County Durham