NEXT, Teeside Retail Park

SinCera were engaged by Key Property Solutions (KPS) to complete several major projects at the Teesside Retail Park in Stockton on Tees. Our scope involved a multitude of retailers with one of the main projects being an extension of an existing ‘Next’ outlet, to make it the largest in the North-East.

NEXT, TEESIDE RETAIL PARK
CONSTRUCTION / GROUNDWORKS / LANDSCAPING

Client: KPS
Date: November 2015
Duration: 42 Weeks
Value: Circa £650k

This project had several challenging aspects that SinCera worked closely with the main contractors on to overcome and eventually deliver some outstanding developments.

The retail park was always live which made logistics quite difficult as well as the fact that the area is also tidal (with respect to ground water) creating some unique problems to solve.


Below are a list of the works which were delivered on this particular project:

• Piling (cropping)
• Pile caps and foundations
• Utility works
• Drainage (0 > 3m)
• Concrete slabs
• Lift and escalator pits
• Kerbs
• Paving (inc. patterned granite)
• Landscaping
• Resurfacing (tarmac)
• Street lighting
• Sub station build
• Super structure masonry
• Structural openings
• Joinery
• Shuttering

Share this project.

Previous
Previous

Tesco Carlisle, Flood Defences

Next
Next

David Lloyd Clubs, Leeds, Spa Refurbishment