Lloyds Bank, Durham
SinCera Retail Solutions (SRS) were engaged by ISG on behalf of The Lloyds Banking Group to carry out construction work on it’s Durham branch. The scope was to install an internal accessibility ramp which presented a number of unique challenges:
City centre logistics
Phasing of works
Meeting strict deadlines
Significant safety and temporary works planning
Specific structural engineering requirements
Working to listed building and conservation area requirements
LLOYDS BANKING GROUP, DURHAM
GROUNDWORKS / CONSTRUCTION / FABRICATION / FIT-OUT
Client: ISG
Date: May 2021
Duration: 25 Weeks
Value: Circa £100k
Below are a list of the works which were delivered on this particular project:
Interior structural work
Concrete floor removal
Formation of internal concrete ramps (for accessibility needs)
Steel fabrication
Interior fit-out
Painting and decorating
Carpeting
Floor fitting
Temporary works:
Propping
Scaffold
Crash deck