Lloyds Bank, Durham

SinCera Retail Solutions (SRS) were engaged by ISG on behalf of The Lloyds Banking Group to carry out construction work on it’s Durham branch. The scope was to install an internal accessibility ramp which presented a number of unique challenges:

  • City centre logistics

  • Phasing of works

  • Meeting strict deadlines

  • Significant safety and temporary works planning

  • Specific structural engineering requirements

  • Working to listed building and conservation area requirements

LLOYDS BANKING GROUP, DURHAM
GROUNDWORKS / CONSTRUCTION / FABRICATION / FIT-OUT

Client: ISG
Date: May 2021
Duration: 25 Weeks
Value: Circa £100k


Below are a list of the works which were delivered on this particular project:

  • Interior structural work

  • Concrete floor removal

  • Formation of internal concrete ramps (for accessibility needs)

  • Steel fabrication

  • Interior fit-out

  • Painting and decorating

  • Carpeting

  • Floor fitting

  • Temporary works:

    • Propping

    • Scaffold

    • Crash deck